window.dataLayer.push({ 'event': 'olyticsEvent', 'olyticsCategory': 'Events', 'olyticsTag': '' });

Averting Drilling Challenges in HPHT by Customizing the DTW

This method is to estimate the safe Drilling Tolerance Window (DTW) by tailoring the before drilling seismically predicted Fracture (FP) - Pore pressure (PP) profile. The modification is based on estimating the pressure disparity between seals (shale) and reservoirs (sand) especially in HP HT environment.

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.