March 2015
ShaleTech Report
New drill pipe reduces body wear during shale drilling
After detailed analysis of shale well designs and drilling operations in the Bakken, a new drill pipe was introduced to reduce the wear on the pipe body while drilling the intermediate 8¾-in. hole section, as well as providing adequate annular clearance between the pipe and the wellbore to keep the ECDs in check.