Halliburton, Ensign to deploy North American-style shale drilling practices onshore Australia

September 10, 2024

(WO) – Empire Energy Group Limited has executed drilling contracts with Ensign Australia and Halliburton to provide drilling services for the Carpentaria-5H (“C-5H”) well in EP187, onshore Australia. 

Ensign Rig 965

Ensign drilling contract. Following detailed commercial and technical due diligence of suitable rigs in Australia and a competitive tender process, Empire has engaged the Ensign Rig 965 to drill, case and suspend the C-5H well in Beetaloo basin permit EP187. The drilling of C-5H is expected to commence in late October 2024.

Of the candidate list, Rig 965 was determined to be the most commercially efficient to operate and mobilize with a strong track record of recent performance drilling similar wells onshore Australia and an experienced crew.

Rig 965 is an ADR-1500 model triple rig with a 750,000 lbs hook load. This rig will reduce drilling time from previous campaigns and run 5 ½” casing. The rig model has a proven track record of drilling wells of similar length throughout Australia. Rig 965 has the capacity to drill beyond the planned total depth of Carpentaria-5H with spare operational capability should it be required.

Halliburton services agreement. Empire has also executed a contract with Halliburton Australia Pty Ltd to fracture stimulate ~60 stages across the planned horizontal production section of C-5H.

Halliburton will provide an integrated services package for the delivery of the C-5H program including stimulation, wireline and coiled tubing.  

Combining both local and international shale knowledge, Halliburton will mobilize over 44,000 HHP to execute a North American-style, high-efficiency 60 stage fracture stimulation program including ancillary services. 

C-5H fracture stimulation is expected to commence shortly after rig release.

C-5H will be drilled from the same wellpad as Carpentaria-2H and Carpentaria-3H, targeting the Velkerri B Shale completed with 5 ½” casing. These three wells will form part of the Carpentaria Pilot Project, for which Empire is expecting first gas deliveries from mid-2025 (subject to regulatory approvals to sell test gas). 

C-5H will be Empire’s longest drilled and stimulated horizontal shale well and will target a ~3,000 m horizontal section and ~60 fracture stimulation stages. 

C-5H will integrate the best completion practices from North American shale analogues and incorporate learnings from Carpentaria-2H and Carpentaria-3H. The goals of the well are to:

  • Execute a development scale well for the Carpentaria Pilot Project;
  • Optimize fracture stimulation design to achieve higher productivity;
  • Conduct a long-term production test to develop a Carpentaria type curve for long laterals for development planning, and
  • Commence gas sales from the Beetaloo basin.

 

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.