Energy Transition

News
January 24, 2024
The agreement includes TotalEnergies’ acquisition of a 85% equity stake in the Jammerland Bugt offshore wind project (240 MW) and a 72.2% equity stake in the Lillebaelt South nearshore wind project (165 MW). Both projects are located in Denmark.

News
January 24, 2024
A halt in approvals or other significant changes to Energy Department reviews of plans to widely export liquefied natural gas (LNG) threaten to disrupt development of huge LNG terminals along the Gulf Coast and elsewhere.

News
January 23, 2024
The agreement with Plenitude bolsters the joint venture formed by BlueFloat and Sener Renewable Investments 3 years ago, creating a leading consortium in the offshore wind sector in Spain with a total portfolio of approximately 1.25 GW of floating offshore wind projects across Galicia (Parque Nordés), Catalonia (Parc Tramuntana) and the Canary Islands (Parque Tarahal).

News
January 22, 2024
ADNOC is developing projects that will capture carbon emissions at its natural gas processing plants and is working to develop a trading desk for credits that can offset emissions.
News
January 21, 2024
Achieving LEED certification for an industrial process and facility is uncommon. The United States Green Building Council (USGBC), a leader in green building, has recorded less than 10 LEED-certified industrial projects in the States since 2010, with Tenaris’s Bay City mill the newest to join these ranks.

News
January 21, 2024
Natural gas producers and pipeline companies are warning the Biden administration against any move to pause U.S. liquefied natural gas (LNG) export approvals, saying it would squander the climate benefits of replacing dirtier coal-fired power worldwide.

News
January 19, 2024
The goal of the accelerator is to fast-track the commercialization of technologies, with a specific focus on manufacturing products derived from captured carbon dioxide and methane.

News
January 18, 2024
The Cameron LNG export plant in Louisiana canceled at least one scheduled shipment, according to people familiar with the matter. Several other planned deliveries from Cameron and Cheniere Energy Inc.’s Corpus Christi facility in Texas were also delayed, they said.

News
January 17, 2024
Mexico Pacific has signed a third long-term Sales and Purchase Agreement (“SPA”) with ExxonMobil LNG Asia Pacific (“EMLAP”) for an additional 1.2 MMtpa of liquefied natural gas (“LNG”) from Train 3 of Mexico Pacific’s Saguaro Energia project located on the west coast of Mexico.
News
January 16, 2024
Under the scope of the contract, McDermott will perform transportation and the structural installation of a 138-kilometer (85 miles) pipeline section, a 15,000 metric tonne (MT) CCS platform jacket, and bridge connecting to the existing central processing platform.
News
January 14, 2024
The study will lay a foundation for potential development of Carbon Capture and Storage (CCS) Hub in the Eastern Economic Corridor of Thailand (EEC).

News
January 14, 2024
Texas LNG, a subsidiary of Glenfarne Energy Transition, LLC, anticipates a final investment decision on the project in 2024, with first cargo deliveries expected in 2028.

News
January 14, 2024
Reviews of applications to broadly export LNG have stretched to more than 330 days under the Biden administration, up from 49 days under former President Donald Trump and 155 days under former President Barack Obama, according to the American Petroleum Institute.

News
January 11, 2024
CGG intends to provide expertise and technological support to C-Questra to accelerate the development of certain carbon storage projects.

News
January 09, 2024
ADNOC is targeting a carbon capture capacity of 10 MMtpa by 2030, equivalent to taking over 2 million internal combustion vehicles off the road.

News
January 09, 2024
This year, two new LNG projects in the U.S. are due to start production: Venture Global LNG Inc.’s Plaquemines facility in Louisiana and Golden Pass in Texas, a joint venture between Exxon Mobil Corp. and QatarEnergy.

News
January 08, 2024
The multi-million-dollar Master Services Agreement covers a wide scope of services. These include, but are not limited to, onshore and offshore management and supervision, provision of personnel, and equipment maintenance.

News
January 08, 2024
This pilot unit, using a pioneer high pressure subsea separation technology (HISEP), will separate oil from CO2-rich gas at the bottom of the ocean and reinject the gas directly into the reservoir.

News
January 08, 2024
Powered by renewable hydroelectricity, Ksi Lisims LNG will be the lowest emission intensity LNG facility in the world, and net-zero ready by 2030. The facility will produce 12 million tonnes per annum of LNG from two floating LNG production and storage facilities.
Article
December 2023
Within energy, transition is directed toward the destruction of the fossil fuel industry and accelerating solar and wind. Moreover, faster is only helpful, if you are headed in the right direction. Our world needs both traditional fossil and renewable energies!
Article
December 2023
As governments and industries increase their efforts to reduce greenhouse gas emissions, there is a rapidly growing demand for carbon credits by companies and individuals seeking to offset the carbon emissions they can’t eliminate on their own.