Oman
News
April 22, 2024
The Marsa LNG project combines upstream gas production of 150 MMcfd with a 1 MMtpa capacity LNG liquefaction plant and a dedicated 300 MWp PV solar plant, positioning the site as one of the lowest GHG emissions intensity LNG plants ever built worldwide, with a GHG intensity below 3 kg CO2e/boe.
News
April 03, 2024
The Yumna-5 well will be drilled at the crest of the structure to drain attic oil left un-swept by the current producers.
News
January 09, 2024
The Menna-1 well was drilled vertically to a total depth of approximately 1,600 m. The well logs indicate hydrocarbons in the Al Khlata, Karim and Birba formations.