Production

News
July 14, 2024
On Shell’s Capital Market Day in 2023, Shell committed to deliver upstream and integrated gas projects coming on stream between 2023 to 2025, with a total peak production of greater than 500,000 boed. Jerun is expected to contribute to this commitment.
News
July 14, 2024
CNOOC Limited announced that the D1 well in the Bozhong 19-6 gas-condensate field, the first ultra-deepwater well in Bohai Bay, has achieved a high yield. The D1 well drilled to a depth of 6,088 m, and is producing approximately 6,300 boed.
News
July 11, 2024
Equinor and its partners Petoro, Vår Energi, and TotalEnergies EP Norge started production from the first Lavrans well in the Kristin South area offshore Norway on July 7, 2024.
News
July 10, 2024
The upcoming period of rapid growth is bolstered by deepwater projects, recent successful discoveries in Indonesia and Malaysia, and positive carbon capture and storage (CCS) advancements, which will be crucial in meeting the region’s sanctioning agenda in the years ahead.
News
July 10, 2024
Capable of producing up to 550 MMcfgd, this project is poised to address the increasing global energy demand at a time when executives are betting on natural gas.
News
July 10, 2024
RMSpumptools is a leader in electrical penetrator and connector systems, mechanical completion systems and intervention tools, subsea connector systems, and ESP monitoring systems for challenging electrical submersible pumping (“ESP”) applications. RMSpumptools designs, manufactures, and delivers its solutions from locations in the United Kingdom, Saudi Arabia, and the United Arab Emirates.
News
July 09, 2024
Manatee is slated to start production in 2027. Once online, Manatee is expected to reach peak production of approximately 104,000 boed.
News
July 03, 2024
The first phase of the development, with five wells in total, is expected to deliver around 100 MMboe with upside from subsequent phases. The Winterfell unit consists of Green Canyon blocks 899, 900, 943, 944, 987 and 988 with follow-on opportunities in adjacent blocks where Kosmos also has an interest.
Article
June 2024
Over the past decade, FourPhase has gathered solids management data from more than 150,000 hrs of operation. Vast amounts of data yield completely new perspectives. Rather than viewing sand production as a challenge, we recognize its positive aspects in reservoir management. Producing sand can be positive for your well, if done in a controlled manner.
News
July 01, 2024
The project is expected to achieve a peak production of approximately 18,100 boed day in 2026, and the oil property is light crude. It is the first oil field in the South China Sea supplied with onshore power.
News
June 30, 2024
The offshore project in eastern South China Sea, with an average water depth of approximately 89 m, will be developed by leveraging the existing production facilities. The project is expected to achieve a peak production of approximately 5,300 boed in 2025.
News
June 26, 2024
The Leviathan gas field offshore Israel – touted as the largest gas field in the Mediterranean- is set for an expansion in natural gas export capacity, following preliminary approval from Israel’s Energy Ministry. The approval allows for an increase in export volume by up to 145 Bcm.
News
June 25, 2024
Exxon filed an environmental authorization application with the government Monday for an investment that’s expected to boost the country’s overall production capacity to nearly 1.5 MMbpd, about the same as OPEC member Nigeria.
News
June 23, 2024
Situated close to producing Block B, which houses the Zafiro field, the blocks are considered to be highly-prospective and are poised to play a major part in revitalizing exploration and production offshore Equatorial Guinea.
News
June 20, 2024
The FPSO will operate in the Jubarte field in the Campos basin's pre-salt layer, off Espírito Santo's coast. The unit has a production capacity of 100,000 bpd and can process 5 MMcmgd.
News
June 18, 2024
The country’s current daily production of about 1.2 MMboed is projected to drop to 0.7 MMboed in 2030 by industry regulator the North Sea Transition Authority. “Getting things right” and moving forward all investment opportunities currently under consideration by companies would temper that decline, meaning production in 2030 would be 0.9 MMboed, OEUK said in its Economy and People report on Tuesday.
News
June 11, 2024
The Sangomar Field Development Phase 1 features the Léopold Sédar Senghor FPSO, named after the first president of Senegal, which is moored approximately 100 km offshore Senegal, with a nameplate capacity of 100,000 bpd.
News
June 06, 2024
The new pump technology will support and enable the gas stream, rich in CO2, to be separated and pumped immediately back into the reservoir at the seabed, 2000 m below the water line, allowing FPSOs to improve their efficiency and reduce their carbon footprint, further enhancing production.
News
May 27, 2024
The contracts were signed for a total of five blocks, S6-A, S6-B, A6-D, A6-E and A6-G, all located offshore Mozambique. The total area is approximately 29,000 km2, with water depths from 500 to 2,500 m.
News
May 16, 2024
PETRONAS, Malaysia's state-owned oil and gas company, has secured a 20-year extension for the Ketapang Contract Area located in the Java Sea.
News
May 16, 2024
Under this arrangement, Equinor will boost its ownership in the Heidrun field and Noatun discovery, while scaling back its stakes in the Tyrihans and Castberg fields, along with the Carmen and Beta discoveries.
Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.